White street continues to have new pipes laid and connected like an erector set. Interestingly enough, there was a drill in the parking area behind Caldwell street that pulled up dirt from the screw. The dirt was manually taken into the construction area with wheelbarrows and a surveyor sited the next drilling site. All the […]
More White Street Sewer Construction
Shooting with a Nikon F2
![](https://www.davidknoble.life/muse/wp-content/uploads/2019/04/David-Knoble-WhiteSt-SewerConstruction-NikonF2-01.jpg)